{"id":63448,"date":"2020-05-08T00:00:00","date_gmt":"2020-05-08T00:00:00","guid":{"rendered":"https:\/\/rockcontent.com\/blog\/define-the-scope-of-a-project\/"},"modified":"2025-09-10T00:32:58","modified_gmt":"2025-09-10T03:32:58","slug":"define-the-scope-of-a-project","status":"publish","type":"post","link":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/","title":{"rendered":"5 steps to define the scope of a project"},"content":{"rendered":"<p><span data-preserver-spaces=\"true\">Are lost tasks, unfocused meetings, and lack of tracking part of your everyday life? Your results can suffer if your work is not appropriately prioritized and organized. In any case, the first order of business should be to&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">define the scope of&nbsp;a project<\/span><\/strong><span data-preserver-spaces=\"true\">. Have you ever heard of this concept?<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Not using a scope means being completely in the dark about what to expect of its tasks and total uncertainty about your performance. Not only that, but it also makes the entire process much harder than it needs to be.<\/span><\/p>\n<p><strong><span data-preserver-spaces=\"true\">your entire business can enjoy the benefits of its results<\/span><\/strong><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<h2 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">What is the scope of a project?<\/span><\/h2>\n<p><span data-preserver-spaces=\"true\">The scope of a project refers to the determining of the most important elements it needs to have to be completed. It includes details such as\u00a0<\/span><strong><span data-preserver-spaces=\"true\">the list of deliverables, goals, costs, budget, staff members, and others<\/span><\/strong><span data-preserver-spaces=\"true\">. The major goal of a scope is to serve as the central reference for the tasks associated with the project.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Anything can be a project, like the development of an app,<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/visual.ly\/blog\/38-apps-to-easily-and-quickly-create-videos-on-your-phone\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-preserver-spaces=\"true\">&nbsp;a video<\/span><\/a><span data-preserver-spaces=\"true\">, or even an event. Your team can contribute to, share, and access the scope of a project as part of a collaborative effort to complete it. Through effective documentation methods, you can make sure the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">right people are always familiar with each stage of the project,&nbsp;<\/span><\/strong><span data-preserver-spaces=\"true\">its demands, needs, and specifics.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">For instance, let&#8217;s say you are developing a project focused on<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/visual.ly\/blog\/5-email-marketing-automation-tactics-b2b\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-preserver-spaces=\"true\">&nbsp;e-mail marketing<\/span><\/a><span data-preserver-spaces=\"true\">. The scope would include elements such as the audience you aim to reach, what metrics will determine your success with your content as well as the necessary steps to complete it.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Here are the most important benefits of working with a well-defined scope of a project:<\/span><\/p>\n<ul class=\"wp-block-list\">\n<li><span data-preserver-spaces=\"true\">allows all&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">stakeholders<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;to be up to date on your project&#8217;s particularities, minimizing the chance of mistakes;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">offers an&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">actionable framework<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;managers can use to assign tasks to the team and reference the steps of the roadmap;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">keeps you and your team&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">focused on concrete steps and goals<\/span><\/strong><span data-preserver-spaces=\"true\">, which prevents your project from losing focus and morphing into something akin to what was expected;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">helps you&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">improve your project<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;as it develops;<\/span><\/li>\n<\/ul>\n<p><span data-preserver-spaces=\"true\">For a project scope to function correctly, it requires good communication between managers and their teams. It is critical that everyone understands their roles and how they affect each step of the project&#8217;s development. This can only be&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">beneficial if the scope is appropriately planned<\/span><\/strong><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<h2 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">How to define the scope of a project?<\/span><\/h2>\n<p><span data-preserver-spaces=\"true\">As you learned in the previous section, writing up the scope of a project is crucial to its success. It requires the correct actions during its planning and execution stages; otherwise, you will risk your project&#8217;s performance and development.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Here are the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">5 most important steps to define the scope of a project&nbsp;<\/span><\/strong><span data-preserver-spaces=\"true\">in your business:<\/span><\/p>\n<h3 class=\"wp-block-heading\">1. <span data-preserver-spaces=\"true\">Identify project needs<\/span><\/h3>\n<p><span data-preserver-spaces=\"true\">What does your project need to be completed? Make sure to consider every single step of the process, from the very beginning until the support it may require after completion.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">This includes information on the necessary professionals and the required skills to develop the project. You may specify the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">positions, departments, and divisions<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;of your business if it makes things easier to visualize. This is also where you must define the tools you will need, either physical or software.&nbsp;<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">If you feel overwhelmed at the notion of establishing such specific needs, you can take previous similar projects as a frame of reference. Also, consult your staff members on what they require to perform what the project asks of them.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Now, one thing that often gets overlooked is a quick gut check\u2014is this project something your team actually wants to do, or is everyone just nodding along because it was assigned from the top? Sometimes a half-hour chat where everyone\u2019s invited to voice doubts or optimism can make all the difference. If you pick up on common concerns, it\u2019s worth working that into your scope, even if it\u2019s more psychological than logistical. Unexpected hiccups tend to come from things left unsaid at this early stage.<\/p>\n<p><span data-preserver-spaces=\"true\">There\u2019s absolutely something to be said for looping in folks who aren\u2019t technically \u201cowners\u201d of the project but still have a stake in the outcome. Sometimes it\u2019s the people on the periphery\u2014support staff, QA testers, the person who always knows where the weird cables are\u2014who catch issues before anyone else sees them coming. Grabbing their input in the needs phase might feel like castling in chess: it\u2019s defensive, but it quietly saves you hassle later. People actually light up when you make space for them, and suddenly you\u2019ve got a smoother runway when the real work begins.<\/p>\n<p><span data-preserver-spaces=\"true\">It\u2019s worth giving this process room to breathe instead of rushing through it. There\u2019s a temptation, especially under a looming deadline, to just sketch a quick list and move along. But digging for details early almost always pays dividends. You might surface a missing tool, or catch that two departments have slightly different vocabularies for the same thing. It won\u2019t solve every future dispute, but you\u2019ll definitely start from a more honest place.<\/p>\n<h3 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">2. Figure out project goals<\/span><\/h3>\n<p><span data-preserver-spaces=\"true\">The next step you need to take involves deciding on your<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/visual.ly\/blog\/content-marketing-goals\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-preserver-spaces=\"true\">&nbsp;project goals<\/span><\/a><span data-preserver-spaces=\"true\">. It means defining what your business aims to achieve in terms of results with the execution and completion of your project. If this seems too abstract, you can use a useful&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">guideline called the SMART criteria<\/span><\/strong><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The acronym SMART is used to help you remember the appropriate characteristics for the objectives you propose for your project. Here is what each letter means and how you can work with each criterion:<\/span><\/p>\n<ul class=\"wp-block-list\">\n<li><span data-preserver-spaces=\"true\">S is for&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">specific<\/span><\/strong><span data-preserver-spaces=\"true\">, which helps you make sure what aspect of your business is benefited by the completion of your project;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">M is for&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">measurable<\/span><\/strong><span data-preserver-spaces=\"true\">, which pushes for the selection of one or more key performance indicators;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">A is for&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">achievable<\/span><\/strong><span data-preserver-spaces=\"true\">, which steers you toward setting goals that are action-oriented and realistic;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">R is for&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">relevant<\/span><\/strong><span data-preserver-spaces=\"true\">, which means setting goals that are aligned with your company&#8217;s objectives and mission;<\/span><\/li>\n<li><span data-preserver-spaces=\"true\">T is for<\/span><strong><span data-preserver-spaces=\"true\">&nbsp;time-bound<\/span><\/strong><span data-preserver-spaces=\"true\">, which is where you specify the time frame of your project and how much time you have to reach your goals.<\/span><\/li>\n<\/ul>\n<p><span data-preserver-spaces=\"true\">Sometimes it helps to remember that goals can shift slightly as you move forward, no matter how diligent you\u2019ve been with SMART criteria. Nobody gets everything absolutely right on the first go\u2014especially if you\u2019re tackling work that\u2019s got a lot of unknowns baked in. When that happens, look at it less as a failure of planning and more as an invitation to refine your scope statement as you go along. Flexibility is underrated for project managers, and honestly, it can be a bit of a lifesaver before things start to unravel.<\/p>\n<h3 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">3. Consider project limitations<\/span><\/h3>\n<p><span data-preserver-spaces=\"true\">While thinking of the scope of a project, you should consider how the balance of your strengths and weaknesses adds to and affects your outcome. This means making sure your limitations do not keep you from reaching your goals.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">To help with this step, you can use the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">SWOT analysis<\/span><\/strong><span data-preserver-spaces=\"true\">. It is a matrix that requires you to fill in your project&#8217;s strengths, weaknesses, opportunities, and threats. The main goal is to be aware of these criteria and how they can affect your ability to complete your project.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Your project&#8217;s&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">strengths<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;should be what your business has that serves as an advantage to others.&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">Weaknesses<\/span><\/strong><span data-preserver-spaces=\"true\">, though self-explanatory, specifies what puts your company at a disadvantage. In&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">opportunities<\/span><\/strong><span data-preserver-spaces=\"true\">, you must indicate the environments you can exploit your strengths. Lastly, add the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">conditions<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;that could cause you issues in threats.<\/span><\/p>\n<h3 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">4. Define resources and budget<\/span><\/h3>\n<p><span data-preserver-spaces=\"true\">How much in terms of resources is needed to achieve your objectives with this project? A critical part of your scope involves defining how much it all will cost and what is the&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">budget your company has set aside for it<\/span><\/strong><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The budget of a project should be enough for it to be concluded successfully within the planned characteristics. It also means making sure that the right resources are spent on the appropriate areas of your project.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">This step must be concluded after the previous ones, as it is substantially easier to think of your costs and budget after defining your needs, goals, and limitations. Because of that, make sure to follow them in order.<\/span><\/p>\n<h3 class=\"wp-block-heading\"><span data-preserver-spaces=\"true\">5. Write a killing project scope statement<\/span><\/h3>\n<p><span data-preserver-spaces=\"true\">You may feel you have everything you need for the scope of a project, but there is still an ultimate piece of<\/span><a class=\"_e75a791d-denali-editor-page-rtfLink\" href=\"https:\/\/visual.ly\/blog\/metrics-to-measure-content-performance\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span data-preserver-spaces=\"true\">&nbsp;content<\/span><\/a><span data-preserver-spaces=\"true\">&nbsp;that ties everything together: your statement.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The goal of the project scope statement is to&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">provide a justification for its existence<\/span><\/strong><span data-preserver-spaces=\"true\">&nbsp;as well as a summary of everything that you defined until now. This is where you specify a common understanding of what is important, which processes are used, and establish the fundamental base of your project.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Also, make sure it is an inspiring read. That way, your team and anyone else that reads your project statement will quickly see its value. To do that,&nbsp;<\/span><strong><span data-preserver-spaces=\"true\">create a narrative that binds your entire scope together<\/span><\/strong><span data-preserver-spaces=\"true\">. Lastly, be careful not to write too much, as being specific is a must.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">To<\/span><strong><span data-preserver-spaces=\"true\">&nbsp;define the scope of a project<\/span><\/strong><span data-preserver-spaces=\"true\">, you must follow the right steps. This is critical for the planning and execution of a quality result, which is always a necessity no matter what business your company is. Follow the guidelines brought by the article and make sure you reach your established goals.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">If your project includes content creation, you must make sure it has the perfect opening to inspire a further read. Check out<\/span><a href=\"https:\/\/pingback.com\/en\/resources\/how-to-write-a-great-introduction\/\" target=\"_blank\" rel=\"noreferrer noopener\"><span data-preserver-spaces=\"true\">&nbsp;this blog post on how to write a great introduction<\/span><\/a><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<p> }}<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Are lost tasks, unfocused meetings, and lack of tracking part of your everyday life? Your results can suffer if your work is not appropriately prioritized and organized. In any case, the first order of business should be to&nbsp;define the scope of&nbsp;a project. Have you ever heard of this concept? Not using a scope means being [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":80908,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-63448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-marketing"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>5 steps to define the scope of a project<\/title>\n<meta name=\"description\" content=\"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"5 steps to define the scope of a project\" \/>\n<meta property=\"og:description\" content=\"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Pingback\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-08T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-10T03:32:58+00:00\" \/>\n<meta name=\"author\" content=\"Carolina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carolina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/\",\"url\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/\",\"name\":\"5 steps to define the scope of a project\",\"isPartOf\":{\"@id\":\"https:\/\/pingback.com\/en\/resources\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage\"},\"thumbnailUrl\":\"\",\"datePublished\":\"2020-05-08T00:00:00+00:00\",\"dateModified\":\"2025-09-10T03:32:58+00:00\",\"author\":{\"@id\":\"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/5931a4533700c840b9f38199581abc33\"},\"description\":\"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.\",\"breadcrumb\":{\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage\",\"url\":\"\",\"contentUrl\":\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/pingback.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"5 steps to define the scope of a project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/#website\",\"url\":\"https:\/\/pingback.com\/en\/resources\/\",\"name\":\"Pingback\",\"description\":\"Marketing for builders\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pingback.com\/en\/resources\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/5931a4533700c840b9f38199581abc33\",\"name\":\"Carolina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/70cde532238b4f8bf4a6e7e589ff0a259eda38fa966564ca7ed7d23e61c27774?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/70cde532238b4f8bf4a6e7e589ff0a259eda38fa966564ca7ed7d23e61c27774?s=96&d=mm&r=g\",\"caption\":\"Carolina\"},\"sameAs\":[\"https:\/\/pingback.com\"],\"url\":\"https:\/\/pingback.com\/en\/resources\/author\/adm1n\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"5 steps to define the scope of a project","description":"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/","og_locale":"pt_BR","og_type":"article","og_title":"5 steps to define the scope of a project","og_description":"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.","og_url":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/","og_site_name":"Pingback","article_published_time":"2020-05-08T00:00:00+00:00","article_modified_time":"2025-09-10T03:32:58+00:00","author":"Carolina","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Carolina","Est. tempo de leitura":"6 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/","url":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/","name":"5 steps to define the scope of a project","isPartOf":{"@id":"https:\/\/pingback.com\/en\/resources\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage"},"image":{"@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage"},"thumbnailUrl":"","datePublished":"2020-05-08T00:00:00+00:00","dateModified":"2025-09-10T03:32:58+00:00","author":{"@id":"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/5931a4533700c840b9f38199581abc33"},"description":"Learn in this article how to define\u00a0the scope of\u00a0a project and why that will be critical to the success of your business.","breadcrumb":{"@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#primaryimage","url":"","contentUrl":""},{"@type":"BreadcrumbList","@id":"https:\/\/pingback.com\/en\/resources\/define-the-scope-of-a-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/pingback.com\/blog\/"},{"@type":"ListItem","position":2,"name":"5 steps to define the scope of a project"}]},{"@type":"WebSite","@id":"https:\/\/pingback.com\/en\/resources\/#website","url":"https:\/\/pingback.com\/en\/resources\/","name":"Pingback","description":"Marketing for builders","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pingback.com\/en\/resources\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Person","@id":"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/5931a4533700c840b9f38199581abc33","name":"Carolina","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/pingback.com\/en\/resources\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/70cde532238b4f8bf4a6e7e589ff0a259eda38fa966564ca7ed7d23e61c27774?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/70cde532238b4f8bf4a6e7e589ff0a259eda38fa966564ca7ed7d23e61c27774?s=96&d=mm&r=g","caption":"Carolina"},"sameAs":["https:\/\/pingback.com"],"url":"https:\/\/pingback.com\/en\/resources\/author\/adm1n\/"}]}},"_links":{"self":[{"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/posts\/63448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/comments?post=63448"}],"version-history":[{"count":4,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/posts\/63448\/revisions"}],"predecessor-version":[{"id":127881,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/posts\/63448\/revisions\/127881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/media?parent=63448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/categories?post=63448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pingback.com\/en\/resources\/wp-json\/wp\/v2\/tags?post=63448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}